Description: Characteristics
Precisely
design and control fiber excess length in
tube and
cable lay length to optimum to ensure excellent strain property in tensile strength and temperature property.
Tube material with
good temperature property and high Young's modulus,
tube filled with compound of non-detectable separated hydrogen to ensure the long term stability in transmission for two long wavelength windows.
Following measures taken to ensure
cable moisture-proof and no influence by
light induction:
High Young's modulus fiber reinforced
plastic as central strength member.
Tubes and all interstices of
cable core filled with moisture-proof and
water blocking compound ensure no longitudinal
water penetration.
PE outer sheath ensures radial moisture-proof.
Metal-free
construction ensures no influence by
light induction.
Cable Main Mechanical Properties and Application
Serial No. Item Requirement
1Allowable Tensile Strength
(N) Short Term 1500
Long Term 600
2Allowable Crush Resistance
(N/10 cm) Short Term 1000
Long Term 800
3Impact 5 points, 3 times at each point (N.M) 5
4Application Aerial
Cable Cross-section and Dimensions
Item Material Description
Outer sheath Black PE Nominal thickness 2.0mm
Binder Yarn Cable core binding
Cable core filling compound Water blocking jelly Water blocking & moisture proof
Loose
tube PBTP O.D.2.5 (2.2) mm
Red and blue as identification color, red
tube before blue one in clockwise direction is A-end
Filler HDPE Diameter same as
tube Fiber
Silicon-based fiber UV colored fiber with sequence of natural, red, blue, green, yellow, orange, brown and white.
Tube filling compound Aqua gel Water blocking & moisture proof
Non-metal strength member FRP Diameter: 2.5 (2.2) mm
Cable O.D 11.5 (10.6) mm
Cable weight 120
| Place of Origin: | China(Mainland) |
|---|
| Brand: | YOFC |
|---|
| Model No. : | A-2 |
|---|
| Payment Terms : | L/C T/T |
|---|
| Quantity: | 20 Kilometer |
|---|
| Minimum Order : | 2 Kilometer |
|---|
| Price Terms : | FOB SHANGHAI |
|---|
| Packaging: | STANDARD |
|---|
| Delivery Lead Time : | A MONTH |